Times ADR (Assessment and Development Review)
Times of India wanted to move away from, a paper based ADR system, to a web based system.
Since CM already had a product which suited their requirement, Times selected us as the development partner for the proposed system.
The system is based on the Assessment model followed at Times and is designed to support a user-base of 10,000+ users.
The system uses a core engine of one of our products, e- Nhancer which has been developed to be compatible with WebSphere.
Technical Platform
|
Web Technology
|
:
|
JSP, Servlets, JDK 1.4/1.5
|
|
Web Server
|
:
|
WebSphere (Application server version 5.0)
|
|
Database
|
:
|
Oracle 8i
|
|
Browsers
|
:
|
IE5.5+, Fire Fox
|
|
|
|
Radio Mirchi
|
|
Time-period
|
2002 - 2003 |
|
Man-hours
|
1,000 |
|
Users
|
NA |
|
People Affected
|
A Few Crores |
|
Back-End
|
NA
|
|
Role
|
Setup, Optimisation, Support |
|
Challenge
|
Radio Mirchi wanted its server sizing and setup done, in order to be able to stream radio over the net.
We managed to size the servers, convert the audio from Radio to Web formats and setup 4 radio stations for them and had planned to roll out 12 more in a month.
We had also setup cluster servers for them for the streaming to about 20 - 30 million internet based NRI audiences, but the project came across some major obstacle, in terms of violation of copyrights due to some discrepancy in a copy right law. |
|
|
|
|
Film Fare
|
|
Time-period
|
2005 - Till date |
|
Man-hours
|
5,000 |
|
Users
|
20 |
|
People Affected
|
1.1 Billion People |
|
Back-End
|
MySQL
|
|
Role
|
Development, Setup, Optimisation, Support |
|
Challenge
|
The Times Group wanted web-based multi-user software for the consolidation of the large number of votes which are polled for the Filmfare awards.
The number of votes polled across the country as well as the number of categories permutations and combinations demanded a lot of stability from the application.
Besides the high accuracy required for such a system, it also needed to be delivered in 3 working days.
We used the latest techniques in Rapid Application Development, to deliver the system, in 2 working days with the required level of accuracy and a multi-user interface. |
|
|